Description
Powerboard (Chargerboard) Segway i2 & x2 for SE
Also called charging unit, chargerboard, powerboard.
In the devices from year of manufacture 2014 – now installed.
Over the years, 2 errors came to light:
1) SEGWAY PT will not charge below 14-17°C (component dependent) – Remedy: Store and charge unit at 15°C or higher.
2) SEGWAY PT Trickle charge for rear battery too low. – Remedy: Charge the device with a timer to restart the charging process.
-> Only the revision AC does not have these problems.
Our charging units for the SEGWAY PT SE i2 or x2 are either Revision AC or already modified and therefore error-free / bug-free!
For repair or replacement please just contact us. The device can be brought by or we are happy to organize collection via freight forwarding within the EU. You can also send us only the base (SEGWAY PT without wheels, without handlebars, without batteries but please with Infokey remote control) to save shipping costs.
Attention:
Electronic components are generally excluded from return, revocation and exchange, as these are specific custom-made products due to the respective programming of the component or due to customer-specific optimizations. Complaints can only be accepted if the component was installed by a trained CROSSTOURS AT technician. In case of self-installation, any form of warranty or guarantee expires.
Customers also searched for:
SEGWAY PT SE Gen2 i2 x2 shows red, lights red, not charging, flashes red, charging error
SEGWAY PT ERROR CODE
C100 Critical Hazard CU A Reporting REAR BATTERY EMPTY |
C200 Critical Hazard CU A Reporting REAR BATTERY SHUTDOWN |
C108 Critical Hazard CU B Reporting FRONT BATTERY EMPTY |
C208 Critical Hazard CU B Reporting FRONT BATTERY SHUTDOWN |
E027 Actuator Fault CU A Reporting BATTERY FAULT |
E02F Actuator Fault CU B Reporting BATTERY FAULT |